Monday, 22 April 2013

past film schedule

Olly and I did 4 seperate film shootings

- Our first day of shooting was on a snow day on the 20th on February. We managed to shoot most of the opening scenes out in the snow however it stopped snowing which made some of the scenes look drastically different however we tried out best to edit the scenes together as quick as we could to make it less noticeable.





- During our second day of shooting (27th of Febuary) the weather had changed quite alot affecting the lighting as it became alot lighter and the settled snow was no where too be found, however during the majority of the shooting was inside at this point.


- during our third day of shooting (3rd of march) we shot most of our chase scene up until the wood as we had to stop due to the lighting becoming dimmer, we didn't want to change the lighting too much.

- Our final day of shooting (10th of march) we got the majority of our shooting done although we didn't intend on filming in as our first desired place we were going to shoot was under construction.

No comments:

Post a Comment